
In 2016 we were invited to provide traditional Structural Engineering and underground drainage for the comprehensive revamp of the boys preparatory School.
The works involved a two-storey extension at the front of the building for additional teaching facilities. This enabled the rest of the preparatory school to be refurbished on a rolling programme meaning the school was able to offer uninterrupted teaching facilities during the entire build programme.
[vc_empty_space height=”20px”]