During the run up to hosting the Olympic games in 2012 we were appointed by SIG to assist in the procurement of various finishing works dotted around the Olympic Village.
Our services included the design and detailing of:-
- The temporary structure built inside the main stadium to house TV broadcasting facilities including provision for television cameras to align with the “Blue Ribbon” 100 metres.
- Civil and structural engineering for the Athletes coach park and security centre.
- Various temporary enclosures for the Hockey Centre.